From "debris in corner of crane base" to a signed report
One item, start to finish.
- 1. Your note on site
debris and loose rock in corner of crane base excavation under the cage
- 2. Drafted for you
AI draft, not checked yetDebris and loose rock were observed within the corner of the crane base excavation beneath the reinforcement cage.
- 3. You approve
Signed offRecommendation: clean the excavation of all debris and loose material before the pour.
30 → 5 minDesk time per report. About 30 minutes today; 5 is the trial's target. We'll show the measured number once the trial ends.
Capture on site. Approve at the desk.
One app for the inspection report: the phone for photos and notes, the desk for checking wording and signing off.
Demo. Pre-written wording, nothing is sent.
IR.7 Crane base, Job E-1001
debris and loose rock in corner of crane base excavation under the cage
Built for how engineers work
- Works offline, nothing lostPhotos and notes are saved on the phone and sync when there's signal.
- Your firm's Word templateWord, PDF and a photo zip, in the layout your clients already know.
- AI drafts, a person approvesNothing leaves the office until an engineer signs it off.
- Regulation 126 certificatesMade with the report, from the project's details.
- Photo location data removedEvery photo is cleaned before it's stored.
- Data kept in AustraliaReports, photos and AI drafting stay onshore.